ENGINEERING CONSULTING FIRM est. 1998

CONSTRUCTION PROJECTS

ADDITION IN HEIGHT OF TWO (2) NEW FLOOR LEVELS, FROM STEEL STRUCTURE, ΑΤ THE RESIDENCE COMPLEX IN REA, DROSIA, ATTICA.

CLIENT: PRIVATE – YEAR 2012

HAGER’s FACTORY FOR MANUFACTURING AND PACKING ELELCTRIC DISTRIBUTION & CONTROL EQUIPMENT.

CLIENT: HAGER HELLAS AEBE – YEAR 2007

WORKS FOR THE ENHANCEMENT OF THE EXHIBITS OF THE BYZANTINE & CHRISTIAN MUSEUM’s PERMANENT EXHIBITION (phase A)

DIRECTOR OF BYZANTINE & CHRISTIAN MUSEUM: DIMITRIOS KONSTANTIOS
MUSEOGRAPHY and EXHIBITION DESIGN: L. KATSANIKA

CLIENT: BYZANTINE & CHRISTIAN MUSEUM – YEAR 2003 – 2005

SUPPLY, INSTALLATION & PROGRAMMING OF INSTABUS-KNX FOR LIGHTING SYSTEM OF THE BYZANTINE & CHRISTIAN MUSEUM’s PERMANENT EXHIBITION (PHASE A)

CLIENT: BYZANTINE & CHRISTIAN MUSEUM – YEAR 2005

DESIGN, SUPPLY AND INSTALLATION OF :

  • 72 SPECIALIZED SHOWCASES
  • LIGHTING FIXTURES AND FITTINGS
  • CONSTRUCTIONS (CEILINGS, PARTITIONS, BASES, SUPPORTS)

FOR THE PERMENANT EXHIBITION OF THE BYZANTINE & CHRISTIAN MUSEUM (phase B)

DIRECTOR OF BYZANTINE & CHRISTIAN MUSEUM: DIMITRIOS KONSTANTIOS

MUSEOGRAPHY and EXHIBITION DESIGN: AVGI TZAKOU

CLIENT: BYZANTINE & CHRISTIAN MUSEUM – YEAR 2007-2010

STUDY, CONSTRUCTION AND INSTALLATION OF TWO (2) NEW WAREHAOUSES AT 35 DRAKONTOS str. IN AKADIMIA PLATONOS FOR THE RELOCATION OF OLD EXISTING WAREHAOUSES AND MAINTENANCE & CONSERVATION WORKSHOPS OF THE 3RD EPHORATE OF PREHISTORIC AND CLASSICAL ANTIQUITIES FROM THE ARCHAEOLOGICAL SITE OF ANDRIANOS LIBRARY

CLIENT: MINISTRY OF CULTURE – 3rd EPHORATE OF PREHISTORIC AND CLASSICAL ANTIQUITIES YEAR 2007

NEW 7-STOREY OFFICE BUILDING ON PILOTIS AND BASEMENT, AT 40 VATATZI str. (Building Block 47/70) IN NEAPOLI, ATHENS.

CLIENT: EUROPEAN PROFILES SA – YEAR 2005

NEW SPRIDER STORE, 54 ERMOU str., ATHENS

CLIENT: SPRIDER STORES SA – YEAR 2008

STUDIO ADIDAS ORIGINALS – ADIDAS STORE IN GOLDEN HALL.

CLIENT: ADIDAS – YEAR 2008