CONSTRUCTION PROJECTS
ADDITION IN HEIGHT OF TWO (2) NEW FLOOR LEVELS, FROM STEEL STRUCTURE, ΑΤ THE RESIDENCE COMPLEX IN REA, DROSIA, ATTICA.
CLIENT: PRIVATE – YEAR 2012
HAGER’s FACTORY FOR MANUFACTURING AND PACKING ELELCTRIC DISTRIBUTION & CONTROL EQUIPMENT.
CLIENT: HAGER HELLAS AEBE – YEAR 2007
WORKS FOR THE ENHANCEMENT OF THE EXHIBITS OF THE BYZANTINE & CHRISTIAN MUSEUM’s PERMANENT EXHIBITION (phase A)
DIRECTOR OF BYZANTINE & CHRISTIAN MUSEUM: DIMITRIOS KONSTANTIOS
MUSEOGRAPHY and EXHIBITION DESIGN: L. KATSANIKA
CLIENT: BYZANTINE & CHRISTIAN MUSEUM – YEAR 2003 – 2005
SUPPLY, INSTALLATION & PROGRAMMING OF INSTABUS-KNX FOR LIGHTING SYSTEM OF THE BYZANTINE & CHRISTIAN MUSEUM’s PERMANENT EXHIBITION (PHASE A)
CLIENT: BYZANTINE & CHRISTIAN MUSEUM – YEAR 2005
DESIGN, SUPPLY AND INSTALLATION OF :
- 72 SPECIALIZED SHOWCASES
- LIGHTING FIXTURES AND FITTINGS
- CONSTRUCTIONS (CEILINGS, PARTITIONS, BASES, SUPPORTS)
FOR THE PERMENANT EXHIBITION OF THE BYZANTINE & CHRISTIAN MUSEUM (phase B)
DIRECTOR OF BYZANTINE & CHRISTIAN MUSEUM: DIMITRIOS KONSTANTIOS
MUSEOGRAPHY and EXHIBITION DESIGN: AVGI TZAKOU
CLIENT: BYZANTINE & CHRISTIAN MUSEUM – YEAR 2007-2010
STUDY, CONSTRUCTION AND INSTALLATION OF TWO (2) NEW WAREHAOUSES AT 35 DRAKONTOS str. IN AKADIMIA PLATONOS FOR THE RELOCATION OF OLD EXISTING WAREHAOUSES AND MAINTENANCE & CONSERVATION WORKSHOPS OF THE 3RD EPHORATE OF PREHISTORIC AND CLASSICAL ANTIQUITIES FROM THE ARCHAEOLOGICAL SITE OF ANDRIANOS LIBRARY
CLIENT: MINISTRY OF CULTURE – 3rd EPHORATE OF PREHISTORIC AND CLASSICAL ANTIQUITIES YEAR 2007
NEW 7-STOREY OFFICE BUILDING ON PILOTIS AND BASEMENT, AT 40 VATATZI str. (Building Block 47/70) IN NEAPOLI, ATHENS.
CLIENT: EUROPEAN PROFILES SA – YEAR 2005
NEW SPRIDER STORE, 54 ERMOU str., ATHENS
CLIENT: SPRIDER STORES SA – YEAR 2008
STUDIO ADIDAS ORIGINALS – ADIDAS STORE IN GOLDEN HALL.
CLIENT: ADIDAS – YEAR 2008